000 00849ntm a22002177a 4500
005 20170808093159.0
008 170802s2015 xx a frb 000 0 eng d
040 _aEG-ScBUE
_beng
_cEG-ScBUE
082 0 4 _222
_a624
_bSAF
100 1 _aSafwat, Mariam.
245 1 0 _aApplying the earned value management technique as an effective tool for monitoring and controlling construction projects performance /
_cMariam Safwat.
260 _c2015.
300 _a59 p. :
_bill. (col.) ;
_c28 cm.
500 _aA dissertation is submitted to faculty of engineering, the British University in Egypt, in achievement of the requirements for the bachelor degree in civil engineering
590 _aRAHMA KHALED
650 7 _2BUEsh
_aCivil engineering
_vProjects
653 _bENGCIV
_cAugust2017
655 _vSPRO
700 1 _aMorcos,Maged.
_eths
942 _2ddc
999 _c25232
_d25204