Image from Google Jackets

Applying the earned value management [evm] technique as an effective tool for monitoring and controlling construction project performance / Mohamed Ahmed Sameh Negida.

By: Contributor(s): Material type: TextTextPublication details: 2015.Description: 72 p. : ill. (col.) ; 28 cmSubject(s): Genre/Form: Issued with: DDC classification:
  • 22 624 NEG
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode Item holds
Projects - Students (NB)	Projects - Students (NB) Central Library Second Floor 624 NEG (Browse shelf(Opens below)) Not for loan 000046707
Total holds: 0

A dissertation submitted to the Faculty of engineering, the British University in Egypt, in partial fulfillment of the requirements for the bachelor degree in civil engineering.

manar

There are no comments on this title.

to post a comment.