Construction cost management : learning from case studies / Keith Potts and Nii Ankrah.
By: Potts, Keith F
Contributor(s): Ankrah, Nii
Material type: 




Item type | Current location | Collection | Call number | Vol info | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|---|
![]() |
Central Library First floor | Alahram | 624.0681 POT (Browse shelf) | Checked out | 21/02/2021 | 000032418 | ||
![]() |
Central Library First floor | Baccah | 624.0681 POT (Browse shelf) | 2447 | Available | 000038081 |
Index : p. 359-367.
Includes bibliographical references.
Part 1. Introduction -- Introduction and Overview -- Reports and Recommendations -- Part 2. Management of the Pre-contract Stage -- Selecting the Cosultants and Contractors -- Pre-contract Cost Management -- Cost Management on PFI Projects -- Contractor's Estimating and Tendering -- Part 3. Key Tools and Techniques -- Value Management -- Risk Management -- Whole-life Costing -- Part 4. Procurement Strategies -- Organizational Methods -- Organizational Methods -- Payment Systems and Contract Administration -- Part 5. Management of the Post-contract Stage -- Contractors' Cost Control and Monitoring Procedures -- Change Management : Valuing Variations -- Claims Management -- Part 6. Contracts and Case Studies -- The Engineering and Construction Contract -- FIDIC Standard Forms of International Construction Contract -- Case Study: Heathrow Terminal.
There are no comments for this item.